Wednesday, December 8, 2010

How to Decide on a Time Step in InfoSWMM

Note: How to Decide on a Time Step in InfoSWMM

Step 1: Your first guess was 300 seconds which had a very large continuity and unstable links. If you look at the your average time step a good time step would be 10 seconds based on your average time step of 2.6 seconds.


Step 2: Run your model with a time step of 10 seconds and check the flows and the continuity error. In this case by using a maximum time step near the average time step you got rid of the continuity error and the unstable link flows.


No comments:

InfoSWMM: A 2030 AI-Assisted Study Guide

  InfoSWMM: A 2030 AI-Assisted Study Guide delete   InfoSWMM: A 2030 AI-Assisted Study Guide A comprehensive study guide for someone in 2030...