How to Use the Map Display for the Maximum Adjusted d/D or Maximum q/Q in an EPS InfoSewer Simulation
How to Use the Map Display for the Maximum Adjusted d/D or Maximum q/Q in an EPS InfoSewer Simulation
You can do a Map Display of the adjusted d/D values (Figure 1) from the Gravity Main Range Report (Figure 2) to show those pipes that are full thematically. For example, the links in red in Figure 1 show the effect of the pump blockage and the links in green are those NOT full due to the pump blockage. You will need to copy the adjusted d/D or the maximum q/Q values from the Range report to the Link Information Table to have some values to Map (Figure 3 and 4). The maximum adjusted d/D or the Maximum q/Q can be mapped using the new link information (Figure 5).
Figure 1 Map Display of the Maximum Adjusted d/D from the Gravity Range Report.
Figure 2. Maximum Adjusted d/D or M
Figure 3. Create a new variable In the Link Information Table.
Figure 4. New variables for the Map Display from the Range Report in the Pipe Information Tables for Each Link.
Figure 5. Link Information new Parameters of Variables can be used to Display the maximum d/D or
|
No comments:
Post a Comment