Problem: As SWMM5 is a link node network, the area of a Storage Node is both the area of the Wet Well and typically ½ the surface area of the connecting links. There is no surface area for the Pump(s) downstream of the Wet Well (Storage) but the area of the upstream links will add to the surface area of the Wet Well. One Answer: You can eliminate this issue by adding a in a Dummy link to connect the upstream Gravity Main links to the Wet Well. The Dummy link has no surface area and sets the Outflow of the link to the Total Inflow of the Upstream Node to the Dummy link. The Wet Well will then only have the surface area of the Wet Well.
Autodesk Technologist with Information about Stormwater Management Model (SWMM) for watershed water quality, hydrology and hydraulics modelers (Note this blog is not associated with the EPA). You will find Blog Posts on the Subjects of SWMM5, ICM SWMM, ICM InfoWorks, InfoSWMM and InfoSewer.
Subscribe to:
Post Comments (Atom)
Today is day 356 or 97.5 percent of the year 2024
English: Today is day 356 or 97.5 percent of the year 2024 Mandarin Chinese: 今天是2024年的第356天,即97.5% Hindi: आज 2024 का 356वां दिन या 97.5 प्रत...
-
@Innovyze User forum where you can ask questions about our Water and Wastewater Products http://t.co/dwgCOo3fSP pic.twitter.com/R0QKG2dv...
-
Subject: Detention Basin Basics in SWMM 5 What are the basic elements of a detention pond in SWMM 5? They are common in our back...
-
Soffit Level ( pipe technology ) The top point of the inside open section of a pipe or box conduit. The soffit is the ...
No comments:
Post a Comment