Subject: SWMM 5 will iterate for the new node depth at each time for a minimum of 2 iterations to a maximum of 8 iterations based on the Node Continuity equation. If you plot the average number of iterations over time then typically the number of iterations go up as the Inflow increases. The nodes with the most iterations changes over time as the peak flow moves through the network as shown in this plan view. The iterations used during the simulation is a function of the node stop tolerance which has a default value of 0.005 feet in SWMM 5.
Autodesk Technologist with Information about Stormwater Management Model (SWMM) for watershed water quality, hydrology and hydraulics modelers (Note this blog is not associated with the EPA). You will find Blog Posts on the Subjects of SWMM5, ICM SWMM, ICM InfoWorks, InfoSWMM and InfoSewer.
Showing posts with label Average Number of Node Iterations. Show all posts
Showing posts with label Average Number of Node Iterations. Show all posts
Saturday, October 2, 2010
Subscribe to:
Posts (Atom)
Today is day 356 or 97.5 percent of the year 2024
English: Today is day 356 or 97.5 percent of the year 2024 Mandarin Chinese: 今天是2024年的第356天,即97.5% Hindi: आज 2024 का 356वां दिन या 97.5 प्रत...
-
@Innovyze User forum where you can ask questions about our Water and Wastewater Products http://t.co/dwgCOo3fSP pic.twitter.com/R0QKG2dv...
-
Subject: Detention Basin Basics in SWMM 5 What are the basic elements of a detention pond in SWMM 5? They are common in our back...
-
Soffit Level ( pipe technology ) The top point of the inside open section of a pipe or box conduit. The soffit is the ...