Create Watersheds Using InfoSWMM Subcatchment Manager


Subject:  Create Watersheds Using InfoSWMM Subcatchment Manager
  
The Subcatchment Manager of InfoSWMM will  help calculate most of the  physical parameters associated with a Watershed or Subcatchment in SWMM 5 from a Digital Elevation Data (Step 1).  The Subcatchments area created from a Flow Direction Raster (Step 2) and a Flow Accumulation Raster (Step 4) after filling in any Sinks in the DEM (Step 3).  The created watersheds (Step 5).   The physical parameters estimated from the DEM are shown in Figure 1.

Figure 1.  Physical Data Estimated from a DEM using the Subcatchment Manager in InfoSWMM.


Step 1.  Find, Create or Otherwise Locate a TIN, DEM or DTM for the project area with elevation data that you can  use with the InfoSWMM Subcatchment Manager.


Step 2.   Create a Flow Direction Raster using the Watershed Command.


Step 3.   Check to see if there are Sinks in the Elevation Data that have to be filled using the Filled Sink Command.


Step 4.   Create a Flow Accumulation Raster


Step 5.   Create the Watersheds from the Flow Direction and Flow Accumulation Rasters.





Saturday, July 27, 2013

Create Watersheds Using InfoSWMM Subcatchment Manager

Subject:  Create Watersheds Using InfoSWMM Subcatchment Manager


The Subcatchment Manager of InfoSWMM will  help calculate most of the  physical parameters associated with a Watershed or Subcatchment in SWMM 5 from a Digital Elevation Data (Step 1).  The Subcatchments area created from a Flow Direction Raster (Step 2) and a Flow Accumulation Raster (Step 4) after filling in any Sinks in the DEM (Step 3).  The created watersheds (Step 5).   The physical parameters estimated from the DEM are shown in Figure 1.

Figure 1.  Physical Data Estimated from a DEM using the Subcatchment Manager in InfoSWMM.


Step 1.  Find, Create or Otherwise Locate a TIN, DEM or DTM for the project area with elevation data that you can  use with the InfoSWMMSubcatchment Manager.


Step 2.   Create a Flow Direction Raster using the Watershed Command.


Step 3.   Check to see if there are Sinks in the Elevation Data that have to be filled using the Filled Sink Command.


Step 4.   Create a Flow Accumulation Raster


Step 5.   Create the Watersheds from the Flow Direction and Flow Accumulation Rasters.



Monday, January 2, 2012

Create Watersheds Using InfoSWMM Subcatchment Manager

Subject:  Create Watersheds Using InfoSWMM Subcatchment Manager

Create Watersheds Using InfoSWMM Subcatchment Manager

by dickinsonre
Subject:  Create Watersheds Using InfoSWMM Subcatchment Manager  
The Subcatchment Manager of InfoSWMM will  help calculate most of the  physical parameters associated with a Watershed or Subcatchment in SWMM 5 from a Digital Elevation Data (Step 1).  The Subcatchments area created from a Flow Direction Raster (Step 2) and a Flow Accumulation Raster (Step 4) after filling in any Sinks in the DEM (Step 3).  The created watersheds (Step 5).   The physical parameters estimated from the DEM are shown in Figure 1. 
Figure 1.  Physical Data Estimated from a DEM using the Subcatchment Manager in InfoSWMM.

 Step 1.  Find, Create or Otherwise Locate a TIN, DEM or DTM for the project area with elevation data that you can  use with the InfoSWMM Subcatchment Manager.
 

Step 2.   Create a Flow Direction Raster using the Watershed Command.


Step 3.   Check to see if there are Sinks in the Elevation Data that have to be filled using the Filled Sink Command.

 Step 4.   Create a Flow Accumulation Raster

 Step 5.   Create the Watersheds from the Flow Direction and Flow Accumulation Rasters.
 



Today is day 356 or 97.5 percent of the year 2024

English: Today is day 356 or 97.5 percent of the year 2024 Mandarin Chinese: 今天是2024年的第356天,即97.5% Hindi: आज 2024 का 356वां दिन या 97.5 प्रत...