Thursday, August 8, 2013

How to Use the SWMM 5 Excel Tool with InfoSewer CSV Files

How to Use the SWMM 5 Excel Tool with InfoSewer CSV Files

1. Export Link and Manholes in InfoSewer for your current Scenario to CSV files,
2. Set up the Excel Add on for SWMM 5 by using the command Tools, and Configure Tools (see below)
3. Run SWMM 5 and edit the data in Excel, you should be able to copy and paste the information from the CSV files into the correct SWMM 5 sections.


Saturday, July 27, 2013

How to Use the SWMM 5 Excel Tool with InfoSewer CSV Files

How to Use the SWMM 5 Excel Tool with InfoSewer CSV Files

1. Export Link and Manholes in InfoSewer for your current Scenario to CSV files,
2. Set up the Excel Add on for SWMM 5 by using the command Tools, and Configure Tools (see below)
3. Run SWMM 5 and edit the data in Excel, you should be able to copy and paste the information from the CSV files into the correct SWMM 5 sections. 

How to Use the SWMM 5 Excel Tool with InfoSewer CSV Files

Wednesday, October 24, 2012

How to Use the SWMM 5 Excel Tool with InfoSewer CSV Files

How to Use the SWMM 5 Excel Tool with InfoSewer CSV Files

How to Use the SWMM 5 Excel Tool with InfoSewer CSV Files

by dickinsonre
How to Use the SWMM 5 Excel Tool with InfoSewer CSV Files

1. Export Link and Manholes in InfoSewer for your current Scenario to CSV files,
2. Set up the Excel Add on for SWMM 5 by using the command Tools, and Configure Tools (see below)
3. Run SWMM 5 and edit the data in Excel, you should be able to copy and paste the information from the CSV files into the correct SWMM 5 sections.
  




Today is day 356 or 97.5 percent of the year 2024

English: Today is day 356 or 97.5 percent of the year 2024 Mandarin Chinese: 今天是2024年的第356天,即97.5% Hindi: आज 2024 का 356वां दिन या 97.5 प्रत...