Showing posts with label Iterative Hot Start File in SWMM 5. Show all posts
Showing posts with label Iterative Hot Start File in SWMM 5. Show all posts

Sunday, April 10, 2011

Iterative Hot Start File in SWMM 5

Subject:  Iterative Hot Start File

1.       If the continuity error is due to the lack of a hot start file,
2.       You should make the hot start file iteratively,  or successively Save and Use two hot start files until the initial and final stored volume is about the same in the flow routing continuity table,
3.       1st Step: Save Hot Start File 1,
4.       2nd Step: Use Hot Start File 1 and Save Hot Start File 2
5.       3rd Step: Use Hot Start File 2 and Save Hot Start File 1 and
6.    Repeat until the initial and final storage volume is about the same



Reasons for ICM SWMM inside of ICM alongside of ICM InfoWorks Networks

ICM SWMM vs. SWMM5 ICM SWMM directly uses the EPA SWMM5 engine, making it functionally equivalent to SWMM5 in terms of calculations and perf...