Showing posts with label SWMM5 Groundwater Flow Components. Show all posts
Showing posts with label SWMM5 Groundwater Flow Components. Show all posts

Sunday, July 28, 2013

SWMM5 Groundwater Flow Components

Note:  There are three sub flow components in the calculation of the groundwater flow from a SWMM 5 Subcatchment. 

1st ComponentFlow = Groundwater Flow Coef. * (LowerDepth – Aquifer Bottom to Node Invert) ^ Groundwater Flow Exponent

2 nd ComponentFlow = SurfaceWater Flow Coef. * (Aquifer Bottom to Water Surface – Aquifer Bottom to Node Invert) ^ SurfaceWater Flow Exponent

3rd ComponentFlow = SurfaceWater-Groundwater Flow Coef. * (Aquifer LowerDepth * Aquifer Bottom to Node Invert)

The total flow is the sum of all three components.

Wednesday, October 20, 2010

SWMM5 Groundwater Flow Components

Note: There are three sub flow components in the calculation of the groundwater flow from a SWMM 5 Subcatchment.
1st Component: Flow = Groundwater Flow Coef. * (LowerDepth – Aquifer Bottom to Node Invert) ^ Groundwater Flow Exponent
2 nd Component: Flow = SurfaceWater Flow Coef. * (Aquifer Bottom to Water Surface – Aquifer Bottom to Node Invert) ^ SurfaceWater Flow Exponent
3rd Component: Flow = SurfaceWater-Groundwater Flow Coef. * (Aquifer LowerDepth * Aquifer Bottom to Node Invert)
The total flow is the sum of all three components.

Today is day 356 or 97.5 percent of the year 2024

English: Today is day 356 or 97.5 percent of the year 2024 Mandarin Chinese: 今天是2024年的第356天,即97.5% Hindi: आज 2024 का 356वां दिन या 97.5 प्रत...