Showing posts with label Simulating a Blocked Pipe in SWMM 5 and InfoSWMM. Show all posts
Showing posts with label Simulating a Blocked Pipe in SWMM 5 and InfoSWMM. Show all posts

Saturday, July 27, 2013

Simulating a Blocked Pipe in SWMM 5 and InfoSWMM

Note:  For example, you can use the Simulation Elapsed time as the Premise and a complete closure of the orifice as the action to simulate a blockage in a portion of the network.  A circular orifice can be used to simulate a circular pipe and of course a rectangular orifice can simulate a rectangular pipe.

AI Rivers of Wisdom about ICM SWMM

Here's the text "Rivers of Wisdom" formatted with one sentence per line: [Verse 1] 🌊 Beneath the ancient oak, where shadows p...